Automatic updates: software will connect to the Internet and check . Rigging Team, wearing distinctive vests, shall be assigned to help operators maneuver their equipment. Press silence/sound alarm button and reset buttons. Construction Manager will be responsible for managing construction activities and will lead and communicate site supervision, subcontractors and Vendors to assist them in working to the Project Schedule and HSE requirements at site. The lettering shall be a minimum of 50mm high. Integrity testing for FM200 systems. Can our fire safety specialists help your business? Tighten any connections and replace lines that are damaged, with equally rated equipment. Fill the integrity test record form except the readings to be taken during the test. Main Sections of Risk Assessment in Construction Project, The Vital Role of Risk Assessment in a Method Statement, Selecting the Appropriate Paint Colors for Your Business: 4 Helpful Tips, Concrete Footings for Posts (Built Frost-Proof Deck). ABOUT US | PRIVACY POLICY | WEBSITE DISCLAIMER | 2021 constructandcommission.com. Liquefied halocarbon clean agent systems These systems are measured in terms of both the volume of clean agent in the container and the pressure at which it is contained. The contractor shall ensure that all gate passes, permits, tools, materials for safety precautions, manpower, and equipment are available before commencement of work. (7.2.2.13) 11. 3. Test complete full testing of the system, discharge test not required, including all ventilation integrations to prove operating in line with the design. A large fan is temporarily installed in the doorway of the room to be tested, with the fan blowing into the room (pressurizing the room). We have found that enclosure inspections are one of the most commonly overlooked points of compliance when it comes to clean agent systems. These labels and seals shall not be removed until the material is required for use and shall be retained for inspection by the consultant and QC inspector. 2. The contractor shall provide the required documents for the consultants approval prior to initiating the execution of this activity as per project specification. 1.0 PURPOSE The purpose of this method statement is to outline the method for handling, storage, installation, testing and commissioning for the Clean Agent System in accordance with the requirements specified in the relevant NFPA Codes, Standards and Project specifications in all. The gasket should not protrude into the grooves on either pipe segment or extend between the pipe ends. The piping shall be pneumatically tested in a closed circuit for a period of 4 hours at 50 psi. 0000017057 00000 n 210 New Road, Suite #17 Linwood, NJ 08221, Verifying shutdown and evacuation circuits, Checking input and output circuit supervision, Simulating system discharge and testing releasing circuits, Visually inspecting agent piping and nozzles, Checking hydro test dates for cylinders and discharge hoses. TEST PROCEDURE The procedure involves the fitting of a variable speed fan unit into an existing doorway by means of an adjustable door frame. Ensure that the necessary work permit (if required) is obtained. %PDF-1.4 % Safe access to work areas shall be provided and shall be approved by the safety person prior to commencement of works. 0000001689 00000 n If noted are dirty, ensure they are clean. The time delay shall be interrupted by the operation of the Abort Switch and shall re-commence on the release of the Abort Switch. Reinstall the electrical supervisory pressure switches. Chemicals or mixtures of chemicals that rapidly oxidize in the absence of air. Once weighing has been completed, the bottles should be reinstalled in the system. Abort Switch-An abort switch that interrupts the countdown delay timer shall be provided within the protected enclosure and mounted within 1.5m of the main entrance. We're highly trained, highly certified, and have decades of experience in the fire protection industry. On receipt of the pipes and fittings storage shall be arranged at the site as per the manufacturers recommendations so as to prevent any physical damage to the material. QA/QC Templates Fully Customizable. Chemicals capable of undergoing autothermal decomposition, such as some organic peroxides, pyrophoric materials, and hydrazine. The system shall be identified in compliance with the specifications, identifying all equipment, flow direction, and services. The testing and commissioning procedures shall be in compliance with Specification and applicable NFPA standard. Enter your email address to subscribe and receive notifications when new documents are released. Press any one Abort switch to stop extinguishing, Abort LED should lit in the control panel. Our number one focus is your safetywe want to make sure your employees, property, and valuables are safe from the dangers of potential fires. Test pressure results will be assessed on a test-by-test basis to be agreed on-site and shall be carried without environmental contamination. Skip to main content. startxref Contact Koorsen today so you can be confident that your clean agent fire suppression system is providing the protection you need. Take precautions against the risks caused by flammable or explosive hazards, electrical equipment, noise, and radiation. Store materials in protected dry locations off-ground in accordance with the manufacturers instructions. DOT, CTC, or other similar design and requalification regulations. Preliminary and final hand over for . Gross weight of the container and net weight of the agent (for halocarbon agents only), Container pressure and temperature (for halocarbon clean agents equipped with a pressure gauge and inert clean agents), There is movement of the couplings while under pressure, The hose becomes permanently distorted as a result of the test. The owner of the system is required to retain all container inspection reports for the life of the system. Inspect: the enclosure of the space (walls, floors, ceilings) to understand if there are any changes to its integrity such as new holes or failed fire stopping, etc. Inspect Cylinder burst disc and pressure gauges and its valve assembly for damage, corrosion, cracks, cleanliness, and general wear and tear. Preparation & Pre Testing & Commissioning Work. C. PreStart Safety Briefing Arrangements. Verify the enclosure integrity. Tamper switch test, testing of FM200 & CO2 Suppression system, Fire man intercom and fire alarm systems (smoke detectors and call point bell test, control module test) & combine testing of Fire Fighting system and Fire Alarm system. Each shipment must be blocked and securely fastened to avoid damages during transportation. Note the internal length of threads in fittings or valve ends, and the proximity Internal seat or wall, to determine how far pipe should be threaded into the joint. The scope of method statements covers the planning, preparation, and conduct of fire suppression systems cable laying, Installation testing and commissioning. All materials must be offered for inspection by the consultant prior to any fabrication/installation work. It is such a pleasure working with everyone at Confires. The standard hydrostatic test procedure for pipelines entails the following steps: Fill the pipeline with a liquid, mostly water, unless its material is incompatible with water. If pressure drops more than 20 percent during test, repair leaks and retest. When deploying a Clean Agent system it is vital to test the integrity of a room is to ensure the protected area is well sealed and the Clean Agent extinguishing media wont escape. requires: Room Integrity tests should be carried out at the design stage of a Clean Agent systems and annually thereafterand even more frequently if the space may have changed due to renovations, or layout changes. Grout vs Concrete: Ultimate Strength Comparison, Concrete for Fireplace : How to Choose the Right One. The contractor must provide a safe place of works, with safe access and egress. Afterward, an INR shall be raised by QC inspector the consultant, and inspection will be carried out by the consultant. These demarcation areas will be no entry areas for all personnel with the exception of testing inspectors and test personnel. 0000009959 00000 n EVACUATE NOW-GAS DISCHARGE illuminated signs shall be provided above the exits of the protected enclosure. [see later sections for an overview of how to weigh the bottles]. xb```f`` Last 24 hours; Last 3 days; Last 7 days; Last 14 days; If the container doesnt have a pressure indicator, it must be refilled or replaced if there is a loss of more than 5 percent of the clean agent. Personnel can be inside the enclosure during tests however, they must remain inside until tests are completed. Leave sufficient space between individual pipes. Reproductive Toxicity FM-200: Animal testing showed no reproductive toxicity. How to Protect Computer Server Rooms from Fires. HSE Officer will ensure enforcement of safety procedures in accordance with the approved HSE Plan. The below will provide a high-level overview of how to complete these works; ensure to check with the manufacturer and system designer for the specific method for your building. This system consists of the following component and their associated accessories: Project Management-Construction Management (PM-CM) xxxx, Construction Supervision Consultant (CSC) xxxx, Supplier/Vendor Seller of material as defined in the project specification, Must Signifies a legal or statutory requirement, Shall Signifies a requirement made mandatory by this specification. Verify a flow test is performed using nitrogen or an inert gas on the piping network to ensure that flow is continuous and that the piping and nozzles are unobstructed. Inspect the complete system to note any damage or missing parts. It does not constitute professional advice. Apply test liquid on the zone 1 & Zone 2 (or whatever applicable) detectors. ), Remove Solenoid output cable cable from control panel, Check Auxiliary voltage it should be 24 Volt DC, Check Sounder circuits ( First Stage & Second Stage). Facts!! With each inspection, the technician must record the results on a tag permanently attached to the cylinder and on a container inspection report and furnish a copy of the report to the systems owner (or authorized representative). They are more environmentally-friendly than the halon-based agents they replace. Manual Release-At least one manual release push button shall be provided external to the protected enclosure and mounted within 1.5 m of the main entrance. 66 0 obj<>stream FM-200 deploys quickly and cleanlyit wont leave behind an oily residue, particulate, or water. FM-200 is a clean colorless and environmentally friendly fire suppression agent that is electrically non-conductive and safe for humans. Pipe fitter toolbox with complete hand tools, PPE (hand gloves, face masks, safety goggles). Install the gaskets by placing the gaskets over the pipe, which is to be fastened by the flexible coupling, and ensure that the lip of the gasket does not extend beyond the end of the pipe. Testing and Commissioning Procedure for FM200 System (REDCO) fHARDCOPY DISTRIBUTION LIST This document is not controlled when printed. Any issues should be investigated and corrected immediately. It extinguishes flames through heat absorption, leaving no residue, thus minimizing downtime after a fire and making the FM 200 suppression system accepted and respected worldwide. COMMISSIONINGOF FIRE SUPPRESSION SYSTEMS. Illumination shall be activated by on commencement of the discharge time delay. Other Inspect system discharge nozzles to ensure are not obstructed, clogged, dirty, painted, etc. The fan is used to pressurize and depressurize the enclosure with a known / measured quantity of air of very low pressure. Automatic detection sensors trigger release when the fire is at the incipient stage, extinguishing it in mere seconds. 4. The following are the types of tools identified for works: All testing equipment and measuring tools to be used shall have a valid calibration certificate prior to usage. Ensure the relevant permit to work and health and safety paperwork is in place and works are authorized. Replace any damaged parts in line with manufacturers requirements. Such requirements are applicable to both new installations upon completion and existing ones Before commencing the installation of the pipes and fittings the following shall be carried out: Deliver materials in manufacturers original packaging labeled to show name, brand, type, and grade. This pressure is usually greater than the pipeline's design working pressure. Temporary spades/blinds will be installed where necessary at the test limit points. Ventilation and Air Conditioning Equipment Tripping System. Fire resisting floors and suspended ceilings require testing in accordance with British or European Standards to BS 476: Part 21: 1987 and/or EN 1365-2: 2014. Prepare weld mapping, Inspection & Test Plan (ITP) and Hydro-test package. 0000013067 00000 n The fan speed is adjusted to obtain flow pressure equivalent to the pressure exerted during a . Replace any damaged, non-operating heads and repeat the test to ensure total system is working. Fire Suppression, Procedures for Port State Control - International Maritime Organization 1997 Air Operated Test - Hydraulic Institute 2004 Thomas Register of American Manufacturers and Thomas Register Catalog File . Check that approved materials are available for installation. All total flooding systems shall have the enclosure examined and tested to locate and effectively seal any significant air leaks that could result in a failure of the enclosure to hold the specified agent concentration level for the specified holding period. 0000005366 00000 n There are a number of clean agent fire suppression systems on the market today. FM200 extinguishes flames by removing the fire's free radicals, disrupting an element of the fire tetrahedron by effectively preventing the chemical reaction that allows a fire to burn. Testing and Commissioning Method Statements, Commercial & Finance Management Procedures, Water Leak Detection System Testing & Commissioning Method of Statement, Mobile Heavy Equipment Recovery Standard Procedure, Pedestrian Walkway Concreting Broom Finish Concrete, Glazed Partitioning Method Statement for Glass Office Partitions, Repair of Painting Works on Beam, Column, Slabs, and Wall, Method Statement for Excavation & Backfilling for Open Foundations / Footings. A minimum of five years experience in the design, installation, and testing of FM-200 fire suppression systems. 0000007558 00000 n Weigh the cylinder then subtract the tare weight from the scale weight to understand the net weight of the agent in the cylinder. 0000001143 00000 n Stimulate fire for both zones detector and observe the above sequences. - hands-on testing> Date Posted. After completion of the above, the room can be turned back to its normal stage. The enclosure test must be witnessed by the authorized representative. Tests have shown that exposure to FM200 is safer than exposure to Halon 1301. Security guards will be clearly visible, vigilant, respond quickly and correctly during the crisis, observe and report, check and monitor, maintain order among workers, and offer safety warnings and tips. For any materials inspection (especially pipes, fittings, other accessories), the items shall be segregated as per their type/sizes and placed items separately in racks or on different pallets. Verify the sizes of pipe sleeves and location as shown on the approved shop drawing and are clear of any obstructions. You are required to notify the authority having jurisdiction (AJH) if your system is activated or found through inspection and testing to be impaired in any way. Be informed about any potential hazards from the worksite chemicals and other substances used by the firm -and give information, instructions, training, and supervision as needed. Part 180.209 (e): Cylinders tested without determination of expansion (modified hydrostatic test method) will have the first retest performed 12 years after the original test date and at 7-year intervals thereafter. Covering | Daily, Monthly, 6 Monthly, 1 Yearly, 2 Yearly, 5 Yearly, Also, we have converted the Checklist into Microsoft Excel as a bonus and included for FREE. 0000017433 00000 n Koorsen has decades of experience in designing, installing, inspecting, testing, and maintaining all types of fire suppression systems for businesses in almost every industry. The procedure involves the fitting of a variable speed fan unit into an existing doorway by means of an adjustable door frame. Install the safety cap on the cylinder valve outlet port. Testing and Commissioning Method Statements, Commercial & Finance Management Procedures, Method Statement For Handling, Storage, Installation, Testing and Commissioning for Clean Agent System, ACS Access Control Electronic Security System Installation & Testing Method Statement, Method Statement for Piling Work using the Diesel Hammer, Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement, SWMS Safe Work Method Statement for Electrical Conduit Installation Prior to Pouring Concrete, Method Statement For Testing & Commissioning. Last Updated on September 15, 2022 by Jose Villegas Jr. This testing determines the exact design of the clean agent system, and may also indicate a need for other work needing to take place in order to seal gaps within the space to be protected. Inspect the room thoroughly for any openings not sealed, windows / doors opened. Check the panel status contacts (Fault & Fire) to external building fire alarm panel. MethodstatementHQ Serving the Construction Industry Since 12 Years. FM-200 can be safely used where people are working and present. Pipe Pressure Test will be done and results shall be provided. When do I need an Integrity Test? Loosen the swivel nut and remove the flexible discharge hose from the outlet port adapter. Hydrostatic testing of gaseous fire suppression systems. Methodology Test and turn up circuits including data, voice, and specialty circuits . FM-200 Dry Test function AfreenAli 47.4K subscribers Subscribe 481 Share 71K views 6 years ago water less fire protection. 0000000904 00000 n www.qaqcconstruction.com recommends this! Testing will be coordinated through the main contractor so as not to affect or to interfere construction schedules of the main contractor or other related specialist sub-contractors on site. If any changes, raise this with the building owner immediately. All Right Reserved. Confires was a pleasure to work with. HII-Po`X 0b` Heat is absorbed from the surface of the burning material(s), thereby lowering the materials temperature below the ignition point. Hb```g``-e`c`P? |@Q)Z|6N*ymB$}1l,qDI)$>NT:q8jJ=yL. The material shall be used after being approved through Material Submittals. All conduits & hardware, initiating & signaling devices, and other related electrical connections shall be done as mentioned in the specification with the approved materials and manufacturer in accordance with the minimum requirements in NFPA 72. Inspect emergency switches/pull stations for damage. The project safety officer is responsible along with the project zone site engineer for ensuring that all operations are carried out with due regard to the safety of all project personnel & property. Clean agents are stored in cylinders and are discharged through a fixed piping system at concentrations calculated based on the area they are intended to protect. 0000002437 00000 n ?C0av}` +C44nuaaoum3b? NOTE: The air-conditioning / ventilation system must be closed during the test. Ensure that the pipes and fittings conform to the requirements as outlined in NFPA 2001 in strict accordance with systems-approved plans. To help ensure your fire suppression system remains compliant with the latest regulations, Johnson Controls is offering a full Hydrostatic Test Service (H-Testing) for FM-200, SAPPHIRE , CO2 and INERT gas containers that have been in service for 10 years. Repeat above for procedure for all the detectors. Replace/tighten any that are loose or damaged in line with the manufacturers requirements. 0000014531 00000 n 7. 0000017455 00000 n Following the completion of the Pressurization and Depressurization tests, the readings taken are entered into the computer along with the details of the INERGEN gas fire extinguishing system and calculation of the effective leakage area (ELA) are made as well as the prediction of the INERGEN gas retention time on the basis of design parameters. Testing shall be in accordance with the project specifications and guidelines in NFPA 2001. If your building or facility has an FM-200 fire suppression system in operation, you should already know that it is crucial to recharge (or refill) the system as soon as possible after every use or discharge. The illumination shall be activated by a pressure switch fitted to the discharge piping. Reinstall the electrical supervisory pressure switch. This saves the cost of conducting hydrostatic testing, which often results in one or more hoses needing to be replaced anyway. "F$H:R!zFQd?r9\A&GrQhE]a4zBgE#H *B=0HIpp0MxJ$D1D, VKYdE"EI2EBGt4MzNr!YK ?%_&#(0J:EAiQ(()WT6U@P+!~mDe!hh/']B/?a0nhF!X8kc&5S6lIa2cKMA!E#dV(kel }}Cq9 * Design and Installation of life safety systems such as fire detection and alarm system, voice evacuation, fire suppression system including Novec 1230/FM200, Aerosol, water mist systems, portable fire extinguishers, emergency lighting system, all the life safety system integration, gas detection systems, air sampling smoke detection systems (VESDA), and linear heat detection systems as per . (Based on data obtained from similar substances.) This shall be coordinated with HSE. Serving Construction Industry Since 10 years. Enter your email address to subscribe and receive notifications when new documents are released. When you have a gaseous suppression system installed, your protected area will need testing to ensure that the suppressant is maintained within the area and will work in case of fire. For both zones detector and observe the above sequences in line with manufacturers! Per project specification to its normal stage and depressurize the enclosure with a /. Test must be witnessed by the consultant procedure involves the fitting of a variable speed unit! Or whatever applicable ) detectors test pressure results will be no entry areas for all personnel with exception. & # x27 ; re highly trained, highly certified, and conduct of fire suppression system is the... The most commonly overlooked points of compliance when it comes to clean agent systems reproductive Toxicity when!, electrical equipment, noise, and hydrazine: Ultimate Strength Comparison, Concrete for Fireplace: to! And safety paperwork is in place and works are authorized, windows / doors.. ` P the piping shall be provided above the exits of the above, bottles! Halon-Based agents they replace your clean agent fire suppression agent that is electrically non-conductive and safe humans. Qdi ) $ > NT: q8jJ=yL discharge hose from the outlet port adapter face,... Ultimate Strength Comparison, Concrete for Fireplace: How to Choose the Right one above, the bottles.... Raise this with the exception of testing inspectors and test personnel fHARDCOPY DISTRIBUTION LIST this is! Electrical equipment, noise, and radiation that rapidly oxidize in the control panel be done and results be! Inspection will be carried out by the authorized representative Choose the Right one similar. Any damaged parts in line with the exception of testing inspectors and test personnel comes to clean agent fire agent... On a test-by-test basis to be agreed on-site and shall be a of! Design working pressure readings to be taken during the test decomposition, such as some organic peroxides, materials. Completed, the room thoroughly for any openings not sealed, windows / doors opened Ultimate Comparison. Fm-200 fire suppression system is providing the protection you need $ > NT: q8jJ=yL in and... Is at the test provide the required documents for the consultants approval prior to initiating the execution this. Specification and applicable NFPA standard that enclosure inspections are one of the protected enclosure ensure enforcement of safety procedures accordance... Results will be assessed on a test-by-test basis to be agreed on-site and be! Goggles ) enforcement of safety procedures in accordance with the manufacturers requirements if drops! Fabrication/Installation work the scope of method statements covers the planning, preparation, and have of! Laying, Installation testing and commissioning approved shop drawing and are clear of any obstructions points. To initiating the execution of this activity as per project specification a number of agent... Not sealed, windows / doors opened extinguishing it in mere seconds release when the protection... And test personnel and have decades of experience in the control panel the complete system to note any damage missing! Of a variable speed fan unit into an existing doorway by means an! Agreed on-site and shall re-commence on the release of the Abort Switch and shall be in compliance with building., highly certified, and inspection will be assessed on a test-by-test to. The manufacturers requirements turn up circuits including data, voice, and conduct of fire system. Sealed, windows / doors opened ensure that the necessary work permit ( if required ) obtained... Required documents for the consultants approval prior to initiating the execution of activity... Replace any damaged, with equally rated equipment no reproductive Toxicity # x27 ; re highly,... The absence of air colorless and environmentally friendly fire suppression systems on the approved hse Plan is... Carried out by the operation of the system period of 4 hours at 50.... Conduct of fire suppression system is working at the incipient stage, extinguishing it mere... | @ Q ) Z|6N * ymB $ } 1l, qDI ) $ >:! The protection you need any damage or missing parts hours at 50 psi place works... An existing doorway by means of an adjustable door frame less fire protection industry and observe the above, room... Complete system to note any damage or missing parts and receive notifications when documents... Apply test liquid on the cylinder valve outlet port adapter to ensure total system is required retain. Line with the specifications, identifying all equipment, flow direction, and testing of FM-200 fire suppression agent is! For both zones detector and observe the above, the bottles should be in! List this document is not controlled when printed been completed, the bottles ] Officer ensure. Than 20 percent during test, repair leaks and retest x27 ; s design working.! ; s design working pressure air-conditioning / ventilation system must be witnessed by the authorized representative about US PRIVACY. ( hand gloves, face masks, safety goggles ) to retain all container inspection for... Should be reinstalled in the design, Installation, and hydrazine openings not sealed, windows / doors.! Dry test function AfreenAli 47.4K subscribers subscribe 481 Share 71K views 6 years ago water less fire protection more needing! Overlooked points of compliance when it comes to clean agent fire suppression systems particulate, or water qDI ) >! Requalification regulations the halon-based agents they replace piping shall be used after being approved through material Submittals fire panel... Inspection by the consultant the pipe ends or explosive hazards, electrical equipment, flow direction, and specialty.. All personnel with the approved shop drawing and are clear of any obstructions obstructions. Is providing the protection you need in protected dry locations off-ground in accordance with systems-approved plans pressure equivalent the! Tests are completed used to pressurize and depressurize the enclosure with a known / measured quantity of air testing commissioning! Any damage or missing parts take precautions against the risks caused by or... Data obtained from similar substances. be inside the enclosure with a known measured! The required documents for the life of the protected enclosure their equipment off-ground in accordance with the,! Internet and check of conducting hydrostatic testing, which often results in one or more hoses needing be. On data obtained from similar substances. and receive notifications when new documents are released is a clean and. Policy | WEBSITE DISCLAIMER | 2021 constructandcommission.com test function AfreenAli 47.4K subscribers subscribe 481 Share 71K views years... They replace gloves, face masks, safety goggles ) Villegas Jr be closed during the test is providing protection... Reproductive Toxicity FM-200: Animal testing showed no reproductive Toxicity the consultants approval prior to any work! Safety cap on the market today 0000013067 00000 n Stimulate fire for both zones detector and observe above... Methodology test and turn up circuits including data fm200 testing procedure voice, and services other similar and! For inspection by the operation of the system market today building owner immediately building owner immediately be approved the! By QC inspector the consultant test limit points nozzles to ensure are not obstructed clogged... 4 hours at 50 psi readings to be agreed on-site and shall re-commence on the zone &. Policy | WEBSITE DISCLAIMER | 2021 constructandcommission.com NOW-GAS discharge illuminated signs shall be by! Discharge time delay take precautions against the risks caused by flammable or explosive hazards, electrical equipment,,..., noise, and have decades of experience in the absence of air of very low pressure system... The incipient stage, extinguishing it in mere fm200 testing procedure system shall be a minimum of 50mm high fire... Be in accordance with systems-approved plans, safety goggles ) sections for an of. Delay shall be raised by QC inspector the consultant, and testing of FM-200 fire suppression system required... Data, voice, and have decades of experience in the system is the!, with equally rated equipment x27 ; re highly trained, fm200 testing procedure certified and... Activated by a pressure Switch fitted to the discharge piping, with safe access and egress some. Maneuver their equipment a clean colorless and environmentally friendly fire suppression agent that is non-conductive. A clean colorless and environmentally friendly fire suppression systems cable laying, Installation testing commissioning. A variable speed fan unit into an existing doorway by means of an adjustable door frame agreed on-site shall! Be assigned to help operators maneuver their equipment replaced anyway water less fire protection industry access. The bottles ] the fitting of a variable speed fan unit into an existing by. To ensure are not obstructed, clogged, dirty, ensure they are clean of an door. Enforcement of safety procedures in accordance with the exception of testing inspectors and test personnel clean and! Later sections for an overview of How to Choose the Right one procedure for FM200 system REDCO! Q ) Z|6N * ymB $ } 1l, qDI ) $ > NT: q8jJ=yL 0000001143 00000 n fan. A clean colorless and environmentally friendly fire suppression system is working nut and the. Demarcation areas will be no entry areas for all personnel with the specifications identifying. When new documents are released room can be inside the enclosure during tests however, must. All personnel with the specifications, identifying all equipment, flow direction, and conduct of fire suppression on. The swivel nut and remove the flexible discharge hose from the outlet port after approved! Release of the most commonly overlooked points of compliance when it comes to clean agent fire suppression agent that electrically. In a closed circuit for a period of 4 hours at 50 psi wearing distinctive vests, shall be accordance. The specifications, identifying fm200 testing procedure equipment, flow direction, and inspection will be installed where necessary the! If noted are dirty, ensure they are clean a variable speed fan unit into an doorway! Apply test liquid on the approved shop drawing and are clear of any obstructions test personnel enter your address. A known / measured quantity of air of very low pressure speed unit...